Self-climbing pouring and working system for high-rise construction

Platform SCP houses all construction site equipment, provides safety barriers and weather protection to ensure safe work even at great heights. Powerful hydraulic cylinders move the platform, formwork, material containers and concrete plaing booms to the next section in just one cycle without a crane.

System. Advance construction of the stiffening core

System. Advance construction of the stiffening core

With this construction method, the building's stiffening core (elevator shafts, stairwells) is erected first, followed by the floors. Separate construction of the building's parts increases construction speed and ensures ideal protection from bad weather.

Floors and walls in one step

Floors and walls in one step

With this construction method, floors and walls are poured in one step, which provides high efficiency and additional acceleration of construction works. 

Well-developed system of logistics, simplicity of working procedures

Well-developed system of logistics, simplicity of working procedures

Due to placing a significant part of the required loads on the platform, storage space on the construction site is saved. To speed up pouring cycles, reinforcement can also be carried out from the platform. The system allows for low suspension of scaffolding in the shaft to perform finishing works simultaneously with concreting.

 

Application. Formwork machine

Application. Formwork machine

(A) Necessary openings in the working platform for material supply or for installing stairways

(B) Safe access routes thanks to flexible use of stair towers

(C) Easy installation of containers for materials and tools. This optimizes the infrastructure

(D) Concrete placing boom can be integrated into the formwork system and repositioned together with the platform SCP 

Moving up by pushing a button

Moving up by pushing a button

Beam and framed formwork together with the working platform is moved up in one go with the help of powerful hydraulic cylinders to the next pouring level. 

Large space and safety at any height

Large space and safety at any height

Large distances when stripping and well-developed scaffolding system porvide performance of works that is as safe, quick and efficient, as on the ground level. 